STAGE 1 -
Pre-construction
Here is the north side and and part of our parking lot.
STAGE 2 -
Installing wall studs and air conditioner

Downstairs

Downstairs
STAGE 3 -
Paint and Sheetrock!!!

Managers Walt and Mike did the painting...some paint actually got on the walls!
STAGE 4 - Ceiling grid installed
and floor painted

Freshly painted floor, view of front door and rat room

A sneak peek of our color scheme
|